A contractor wants to build a raised floor for my bathroom basement that he is building for me instead of breaking the concrete.
Raise basement floor for plumbing.
Step 3 wait for the adhesive to dry and begin reinstalling the toilet vanity and sink if you are not installing tile.
If you are planning to just do the raised floor in half the bathroom you will create a tripping hazard and a dumb looking installation.
You need to have a building permit including a plumbing permit and probably an electrical one also.
Secure it with nails or hardie backer screws use a toilet flange extension to raise the existing toilet flange.
So instead of breaking concrete we built the floor up to accommodate the plumbing.
I ll have to notch the floor joists for pipes which is why i did self leveling underlayment i want everything to be.
So heating and cooling a building with a raised flooring system is more efficient the concrete surface can be finished as a final floor finish as desired by sealing polishing stamping or staining.
The waste pipe is about 4 above the concrete floor.
Place the new osb or backer board on top of the existing floor.
New plumbing new electrical making sure the basement is water tight.
Please leave any questions in the comments section below.
Raised floor system could serve as a high thermal mass base material for radiant heat systems which are distributed by hot air or hot water.
It s best to go into this with someone who.
The plumbing would be underneath the floor.
What materials to use when finishing insulation mold board.
This means i ll have to raise the subfloor to at least that and that s fine because it ll match the rest of the basement.
Is this a viable and safe.
The main waste pipe exits the house about 15 from the shower drain.
Jodyg commercial plumbing 1 03 02 2013 01 02 pm floor drain clean out punkrockplumber 12 04 28.
That is it exits thru the foundation wall not the floor.
Floor drain with no vent olc general plumbing discussion 26 07 13 2016 10 11 pm 2nd floor floor drain smells of sewage.
The basement floor is concrete slab.
This part was just like the electrical moving the washer and dryer and general demolition posts in that i had a rough idea of what to do but it was still my first run through for that skill.